Enquiry

TUNNEL/SHAFT MUCKING

Innovative solutions for high-speed, high-lift applications Infrastructure projects like hydroelectric power plants, underground drinking water, sewage projects require initial vertical shafts and subsequent horizontal tunnels. During such operations, muck needs speedy muck removal is required. For tunnelling operation, movement of material and people through shafts is needed on a daily basis. ElectroMech tunnel/shaft mucking systems efficiently carry out these operations. These solutions provide heights of lift in excess of 300m and high speeds of operation. These are heavy duty, rugged cranes capable of performing in the most challenging and extreme environmental conditions at the sites. For easy, quick and precise assembly of Tunnel Boring Machines (TBM), ElectroMech has also developed specialised solutions built around triple girder cranes using multiple hoists.